Union Mout Albert LXRP

The 2 dangerous and congested level crossings at Union Road, Surrey Hills and Mont Albert Road, Mont Albert have been removed by lowering the rail line into a 1.3km trench. As well as removing the 2 level crossings, a brand-new Union Station was also build. The rail trench design eases congestion and improves safety, allowing for more trains, more often, with an additional 3 services stopping at Union Station during the weekday morning and afternoon peaks. The new Union Station features brand-new, modern station facilities, including a sheltered waiting room, platform access via lifts and stairs, and new pedestrian and cycling connections.

  • Project Name
    Union Mont Albert LXRP
  • Client
    Yarra Contracting
  • Principal
    SEPA
  • Completion
    Dec 2023