Level Crossing Removal

Hallam, UMA, Deer Park, Edithvale & Rosanna Stations

LXRP JV — Level Crossing Removal Project

Melbourne VIC · From 2021 · Multiple packages

$12m+

$12m+

Combined project value

Combined project value

5

5

Stations

Stations

2,435 m³

2,435 m³

Concrete placed at Hallam Station

Concrete placed at Hallam Station

Retaining wall stitch pours, hardscape packages and textured feature walls across five level crossing removal stations.

  • Stitch pours between retaining walls: 350 lm × 8 m wide

  • Multiple hardscape and retaining wall packages

  • Station precinct feature walls with textured finishes

  • Intricate and detailed FRP sections

  • Hallam Station: 2,435 m³ of concrete placed

  • Hallam Station: 227 t of reinforcement installed

  • Hallam Station: 576 m² of formwork installed

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn