North East Link

Manningham Plenum Precast Install & Topping Slab

SPARK — North East Link

Melbourne VIC · Sep 2024 – Apr 2027

60

60

Precast plenum planks across 6 bays

Precast plenum planks across 6 bays

25 / shift

25 / shift

9 m long planks placed

9 m long planks placed

ZERO

ZERO

Safety incidents / injuries

Safety incidents / injuries

60 precast plenum planks placed across 6 bays, with a suspended formwork system that kept tunnelling on the critical path.

  • Placement of 60 precast plenum planks across 6 bays, including all prep works, handrails etc.

  • Design, supply & install of a suspended formwork system for stitch pours, allowing tunnelling works to continue on the critical path

  • Form, reinforce & concrete placement to stitch infill pours & plenum level topping slab

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn