28

Base slab pours

Base slab pours

500–2,000 m³

500–2,000 m³

Per base slab pour

Per base slab pour

4,000 m²

4,000 m²

Formwork to internal core walls

Formwork to internal core walls

18 m

18 m

Maximum core wall height

Maximum core wall height

28 base slab pours of up to 2,000 m³, internal core walls up to 18 m high, and the southbound ramp roof slab.

  • 28 base slab pours ranging from 500 m³ to 2,000 m³

  • Formwork install to all base slabs, avg. 2,000mm deep

  • Install pits & drainage to base slabs

  • 4,000 m² of formwork to internal core walls up to 18 m high

  • Precast install & grouting

  • CFC sheet install between planks

  • Form & pour 1,800mm high stitch pours to edge of precast

  • Form & pour topping slab & delay strips

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn