West Gate Tunnel

North Portal (FCC) Retaining Walls, Capping Beams & Deluge Tanks

CPBJH JV — West Gate Tunnel

Melbourne VIC · Jan 2024 – Apr 2025

400 m

400 m

FRP capping beams

FRP capping beams

1,450 m²

1,450 m²

Formwork installed

Formwork installed

1,600 m³

1,600 m³

Concrete placed

Concrete placed

146 panels

146 panels

132 m of precast wall installed

132 m of precast wall installed

400 m of FRP capping beams, pile caps and upstand walls, and 146 precast wall panels including curved panels.

  • 400 m of FRP capping beams

  • Pile breakback

  • Blinding placement

  • FRP pile cap and upstand walls

  • Precast wall installation, including curved panels

  • Precast stitch FRP

  • Water bin and bin enclosure FRP

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn