North East Link
Bentonite Plant, Guide Walls & Winsor Reserve Spoil Shed
SPARK — North East Link
Melbourne VIC · 2022 – 2024

Heavy-duty pavements, 3,600 lm of guide walls and the Winsor Reserve spoil shed, with zero lost time injuries.
Bentonite plant: 36,000 m² heavy-duty pavement and 200 lm walls
Guide walls: 3,600 lm guide walls
Winsor Reserve spoil shed: 10,000 m² heavy-duty pavement, 600 lm of 4.5 m high walls and 30 no. columns between 6 – 8 m high
Surface works hardstands