North East Link

Bentonite Plant, Guide Walls & Winsor Reserve Spoil Shed

SPARK — North East Link

Melbourne VIC · 2022 – 2024

14,000 m²+

14,000 m²+

Formwork installed up to 8,000mm high

Formwork installed up to 8,000mm high

1,000 t+

1,000 t+

Reinforcement installed

Reinforcement installed

19,000 m³+

19,000 m³+

Concrete placed

Concrete placed

ZERO

ZERO

Lost time injuries

Lost time injuries

Heavy-duty pavements, 3,600 lm of guide walls and the Winsor Reserve spoil shed, with zero lost time injuries.

  • Bentonite plant: 36,000 m² heavy-duty pavement and 200 lm walls

  • Guide walls: 3,600 lm guide walls

  • Winsor Reserve spoil shed: 10,000 m² heavy-duty pavement, 600 lm of 4.5 m high walls and 30 no. columns between 6 – 8 m high

  • Surface works hardstands

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn