North East Link

Bulleen Flood & Retaining Walls

SPARK — North East Link

Melbourne VIC · 2026 – 2027

FRP flood wall, integrated and retaining wall panel install, stitch and infill pours, and precast caps.

  • FRP flood wall

  • Install integrated panels

  • Supply & install grouting and caulking

  • Supply & install strip drain and mega flow

  • Install retaining wall

  • Wall stitch pours

  • Infill pours between precast

  • Install precast caps

  • FRP in-situ corbel

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn

Specialist concrete construction for Australia’s major infrastructure.

Contact

14-16 MacBeth St, Braeside VIC 3195

(03) 9017 3128

admin@sorco.com.au

Sorco acknowledges the Traditional Owners of the lands on which we work, and pays respect to Elders past and present.

© Sorco Group Pty Ltd 2026. All rights reserved.

Privacy policy

LinkedIn